avr 14

We take care of the bar and we open !

lire le Post

The painter ended the bar and Brasserie paint, the shelves wait for the bottles and coffee machine. Ten more days to finish the works, we open (...)

avr 14

The works on all fronts

lire le Post

The kitchen constructor puts the gas mains before install the cuisine piano. During this time, the terrace is cleaned and the hatch checked. (...)

avr 14

All the companies are here !

lire le Post

After the buy-back of the establishment, we start the works step with the plumbers intervention. The kitchen tile is finally arrived the Monday (...)